NB Power Home  |   Site Map  |       
 
  
  
  
   Holding   |   Generation   |   Nuclear   |   Transmission   |   Distribution and Customer Service
 
 
Home
 
Kent Hills Transmission Line
 

NB Power and TransAlta Inc. signed power purchase agreements for 96 MW of wind power. TransAlta Wind Inc. along with their local development partner, Natural Forces Technologies Inc. plan to construct, own and operate a 96 MW wind power facility located in the southeastern part of New Brunswick in Albert County. In order for the electricity produced at the Kent Hills Wind Farm to be supplied to the electrical grid, a transmission line will be built by NB Power Transmission.

Environmental Impact Assessment (EIA) Registration Document and Appendices

Please note: due to the large number of maps included in the EIA documents each document is approximately 20 MB in size. If you are unable to download the documents please contact:

Chantal St.Pierre
Director, Regulatory and Environmental Affairs
NB Power Transmission
(506) 458-6655 or CStPierre@nbpower.com

Project information sheets:

For more Information on wind energy visit:

Project Schedule

  Back to top

 

 
 
Advanced Search
  Media
  Tenders
  Careers
 
 
 
 
 
  © 2007 Énergie NB Power   |   Privacy Policy